Enterprise · EXA Trace

The record keeps following the metal.

The page a QR on an EXA piece opens stops at delivery. EXA Trace lets everyone who touches the metal after that read the history up to them, add what they did, issue codes for the parts they make, and sign for it, so a part in a cabinet two years later still scans back to the heat.

Open EXA Trace → Log in

One chain, one record
Mill certifies the heatEXA tests, cuts and marksVendor machines, adds steps, issues a daughter codeSignatory marks the corner and signs with a photoManufacturer assembles and issues its own codeAudit and regulator read what is opened to them

Software alone cannot prove that a record matches the metal.
EXA holds the metal and creates the first record; every later entry is made by the organisation that held the part at the time, and signed.

Who does what

rolereadswrites
Supplier (mill, stockist)the lots it supplied and what EXA recorded on themcertificates and test reports against its lots
Fabrication vendorits purchases, the pieces it holds and their historysteps on pieces it holds; daughter codes; sign-offs
Final manufacturer (OEM, prime, PSU)its vendors' material, with consent, and the parts delivered to itsteps and codes on the parts it holds (assemblies)
Customer engineering and auditwhat each part's owner has opened to itfindings only
Regulator or certifierwhat is opened to it, every read loggednothing
The hand-off
  1. The vendor receives the piece and scans it: the nine-link genealogy and EXA's test record are already there.
  2. It appends steps as it works: machining, heat treatment, surface, inspection, with its own references and reports.
  3. It issues a daughter code for each part made from the piece and gets a QR.
  4. Its signatory confirms the code is marked on the bottom-left corner of the new part and uploads a photo.
  5. Custody is transferred; the receiver continues the record on its own codes.
What the enterprise sees
  • Every part's history back through the vendor's steps, the cut piece and the plate to the heat and the mill certificate.
  • A vendor's purchases only with the vendor's consent; prices are never shown.
  • Test reports in one list: mill certificate, EXA readings, lab reports, the vendor's inspection records.
Connections
  • Each organisation connects its own systems: ERP, workflow or MES, CAE or PLM, an automation partner.
  • Two endpoints and a token: steps in, history out, a webhook for new events. Named systems are presets, not separate integrations.
  • Later the marking and the sign-off can be done by a partner's cell; the record is the same.
Access is the owner's choice
  • Each daughter part is chain (everyone who handled the same source metal), private (owner, EXA and named organisations) or public (anyone with the code).
  • Audit teams and regulators read what is granted; every read is logged and visible to the owner.
  • Records are append-only: a wrong step is superseded, never edited.

Material requirements and drawings

Inside Trace, a project starts from a material requirement, typed or as a drawing (DXF, STEP, PDF, or a photo). Drawings can be uploaded here on the site as well, wherever a piece can be ordered and without a login: each part is read into a piece at the stocked size that machines to the finished size with a stated allowance, priced with the same engine as the order page, with what was read, inferred or assumed marked and confirmed before it reaches the cart; the certificate and tests are matched to the specification. From a project page the same upload files the pieces under the project.

Open EXA Trace → Accounts are set up by EXA for each organisation.

For enterprises: the digital record matches the physical metal

Vendors scan the billet QR and pass its unique ID to the parts made from that block
Shipment from the mill is tested and taggedBillets are cut to size and retaggedVendors scan the billetMachined parts carry the IDThe enterprise sees part-level history

Software alone cannot prove that a record matches the metal.
EXA holds the metal and creates the digital record, so the two cannot drift apart.

Enterprises oversee material procurement
  • The enterprise can review the material behind each part its vendors make: alloy, heat, mill, certificate, test result.
  • Each lot is tested against the programme’s approved mills and specifications before it reaches a vendor.
  • Material procurement audits become simpler, with EXA as a single point of truth.
  • A vendor’s purchases appear only with the vendor’s consent. Prices are never shown.
Genealogy, chain of custody and testing
  • Genealogy: each part traces back through the cut piece and the plate to the heat and the mill certificate.
  • Chain of custody: every hand-over is recorded, from the mill to the customer.
  • Testing: material tests and lab reports are attached to the lot and to every piece cut from it.

Certified by the mill. Checked by EXA. Tested by a lab if you need it.

Mill certification

What the mill certifies. The EN 10204 3.1 certificate for the heat: chemistry, tensile and yield strength, elongation, heat treatment, thickness, mill and certificate number. Supplied with every part. Sample MTC →

EXA verification

What we check independently, before sale. Certificate matched to the plate · PMI by handheld XRF against the certificate chemistry · hardness and, for aluminium, conductivity (temper) · dimensions at the cut. Recorded on the part’s page. This is a check on the mill’s certificate, not a replacement for it.

Third-party testing

When your specification asks for it. Chemistry (OES), tensile, yield, elongation, ultrasonic and customer-specified tests from a partner NABL-accredited laboratory, ordered with the part. The report names the lab and is attached to every piece from the lot.