The record keeps following the metal.
The page a QR on an EXA piece opens stops at delivery. EXA Trace lets everyone who touches the metal after that read the history up to them, add what they did, issue codes for the parts they make, and sign for it, so a part in a cabinet two years later still scans back to the heat.
Software alone cannot prove that a record matches the metal.
EXA holds the metal and creates the first record; every later entry is made by the organisation that held the part at the time, and signed.
Who does what
| role | reads | writes |
|---|---|---|
| Supplier (mill, stockist) | the lots it supplied and what EXA recorded on them | certificates and test reports against its lots |
| Fabrication vendor | its purchases, the pieces it holds and their history | steps on pieces it holds; daughter codes; sign-offs |
| Final manufacturer (OEM, prime, PSU) | its vendors' material, with consent, and the parts delivered to it | steps and codes on the parts it holds (assemblies) |
| Customer engineering and audit | what each part's owner has opened to it | findings only |
| Regulator or certifier | what is opened to it, every read logged | nothing |
- The vendor receives the piece and scans it: the nine-link genealogy and EXA's test record are already there.
- It appends steps as it works: machining, heat treatment, surface, inspection, with its own references and reports.
- It issues a daughter code for each part made from the piece and gets a QR.
- Its signatory confirms the code is marked on the bottom-left corner of the new part and uploads a photo.
- Custody is transferred; the receiver continues the record on its own codes.
- Every part's history back through the vendor's steps, the cut piece and the plate to the heat and the mill certificate.
- A vendor's purchases only with the vendor's consent; prices are never shown.
- Test reports in one list: mill certificate, EXA readings, lab reports, the vendor's inspection records.
- Each organisation connects its own systems: ERP, workflow or MES, CAE or PLM, an automation partner.
- Two endpoints and a token: steps in, history out, a webhook for new events. Named systems are presets, not separate integrations.
- Later the marking and the sign-off can be done by a partner's cell; the record is the same.
- Each daughter part is chain (everyone who handled the same source metal), private (owner, EXA and named organisations) or public (anyone with the code).
- Audit teams and regulators read what is granted; every read is logged and visible to the owner.
- Records are append-only: a wrong step is superseded, never edited.
Material requirements and drawings
Inside Trace, a project starts from a material requirement, typed or as a drawing (DXF, STEP, PDF, or a photo). Drawings can be uploaded here on the site as well, wherever a piece can be ordered and without a login: each part is read into a piece at the stocked size that machines to the finished size with a stated allowance, priced with the same engine as the order page, with what was read, inferred or assumed marked and confirmed before it reaches the cart; the certificate and tests are matched to the specification. From a project page the same upload files the pieces under the project.
Open EXA Trace → Accounts are set up by EXA for each organisation.
For enterprises: the digital record matches the physical metal
Software alone cannot prove that a record matches the metal.
EXA holds the metal and creates the digital record, so the two cannot drift apart.
- The enterprise can review the material behind each part its vendors make: alloy, heat, mill, certificate, test result.
- Each lot is tested against the programme’s approved mills and specifications before it reaches a vendor.
- Material procurement audits become simpler, with EXA as a single point of truth.
- A vendor’s purchases appear only with the vendor’s consent. Prices are never shown.
- Genealogy: each part traces back through the cut piece and the plate to the heat and the mill certificate.
- Chain of custody: every hand-over is recorded, from the mill to the customer.
- Testing: material tests and lab reports are attached to the lot and to every piece cut from it.
Certified by the mill. Checked by EXA. Tested by a lab if you need it.
What the mill certifies. The EN 10204 3.1 certificate for the heat: chemistry, tensile and yield strength, elongation, heat treatment, thickness, mill and certificate number. Supplied with every part. Sample MTC →
What we check independently, before sale. Certificate matched to the plate · PMI by handheld XRF against the certificate chemistry · hardness and, for aluminium, conductivity (temper) · dimensions at the cut. Recorded on the part’s page. This is a check on the mill’s certificate, not a replacement for it.
When your specification asks for it. Chemistry (OES), tensile, yield, elongation, ultrasonic and customer-specified tests from a partner NABL-accredited laboratory, ordered with the part. The report names the lab and is attached to every piece from the lot.

